SERVICE · 02
SIDING SERVICES
Vinyl, fiber-cement, and engineered-wood siding installed by the same crew that does your roof.
Ballpark cost · 2026 NJ
* Ranges sourced from public NJ market research — your exact number is line-itemized on the proposal.
WHAT IT'LL COST YOU.
What you get EVERY LINE ITEM,
EVERY LINE ITEM,
NONE OF THEM OPTIONAL.
Other roofers leave half this list off the proposal and add it later as "unforeseen." Ours is the full list — every roof, no exceptions.
- Vinyl, fiber-cement, or engineered-wood siding options
- Tear-off and house-wrap inspection included
- Flashing integration with existing or new roofline
- Same crew as your roof — no separate sub
- Manufacturer warranty plus our workmanship guarantee
The 6-step service FROM CALL
FROM CALL
TO FINAL NAIL.
Most jobs are 2 days on-roof. The rest is paperwork — and we do that paperwork so you don't have to.
01
Free inspection
On-site measurement and product walkthrough.
02
Written proposal
Itemized by material + labor, valid for 15 days.
03
Install
Tear-off, house-wrap, flash, install, clean up.
04
Final walk
Final inspection with you before invoice.
FAQ · Siding Services QUESTIONS ABOUT
QUESTIONS ABOUT
SIDING SERVICES.
Got something else? Call the owner directly — he answers the phone himself.
Can I do siding without replacing the roof?
Yes — but if your roof is older than 15 years, doing them together saves on scaffolding and ensures the flashings line up. We'll tell you straight if it's worth bundling.
How long does a siding job take?
Most full-house jobs are 5–7 working days, weather dependent.
Siding Services
FREE · NO PRESSURE · 24-HR TURNAROUND
READY FOR SIDING SERVICES?
Full-house and partial siding installation. We tie siding work into your roof and gutter scope so the envelope is buttoned up in one shot.